Skip to Content

We are doing the order specific bom and order specific routing by CU51
in ECC6.0.
When we do skip the order routing procedure(assin task list) in CU51, after fixing the BOM and click the save button, the system do trigger the routing
material assignment to the base routing(group counter=1) automtaically. It will cause confusion on whether a ture order specific routing. Is anyway to switch off the material assignment automatically in CU51?

To report this post you need to login first.

Be the first to leave a comment

You must be Logged on to comment or reply to a post.

Leave a Reply