This is regarding creation of separate reservation number for each of the operations of maintenance order.
Please find below example of the requirement:
Existing System:
|
|
|
|
|
|
|
|
|
|
1 |
|
| 1 |
| 6300 | 6300 | 10 | 1023 | 1 |
2 |
|
| 5 |
| 6300 | 6300 | 20 | 1023 | 2 |
3 |
|
| 7 |
| 6300 | 6300 | 20 | 1023 | 3 |
Required System:
|
|
|
|
|
|
|
|
|
|
1 |
|
| 1 |
| 6300 | 6300 | 10 | 1023 | 1 |
2 |
|
| 5 |
| 6300 | 6300 | 20 | 1024 | 1 |
3 |
|
| 7 |
| 6300 | 6300 | 20 | 1024 | 2 |
There is an option available in configuration to allow creation of individual Purchase Requisition for the each of the non-stock component (Item Category-N), entered on the maintenance order components screen.
However, there is no such option available for reservations so as to allow creation of separate reservations. Instead of that, system is keeping the same reservation number and creates new line items under the same reservation.
We are currently on ECC 6.0 EHP5. Can anyone tell us. whether it is possible by activating business functions for "Operation account assignment"
Thanks & Regards,
Pradeep