Dear All,

This is regarding creation of separate reservation number for each of the operations of maintenance order.

Please find below example of the requirement:

Existing System:

    Item number
    Material
    Item Category
    Quantity
    UoM
    Plant
    S Loc
    Operation number
    Reservation Number
    Reservation Item Number

1

    MAT1
    L

1

    EA

6300

6300

10

1023

1

2

    MAT2
    L

5

    EA

6300

6300

20

1023

2

3

    MAT3
    L

7

    EA

6300

6300

20

1023

3

Required System:

    Item number
    Material
    Item Category
    Quantity
    UoM
    Plant
    S Loc
    Operation number
    Reservation Number
    Reservation Item Number

1

    MAT1
    L

1

    EA

6300

6300

10

1023

1

2

    MAT2
    L

5

    EA

6300

6300

20

1024

1

3

    MAT3
    L

7

    EA

6300

6300

20

1024

2

There is an option available in configuration to allow creation of individual Purchase Requisition for the each of the non-stock component (Item Category-N), entered on the maintenance order components screen.

However, there is no such option available for reservations so as to allow creation of separate reservations. Instead of that, system is keeping the same reservation number and creates new line items under the same reservation.

We are currently on ECC 6.0 EHP5. Can anyone tell us. whether it is possible by activating business functions for “Operation account assignment”

Thanks & Regards,

Pradeep

To report this post you need to login first.

3 Comments

You must be Logged on to comment or reply to a post.

  1. Thyagarajan Krishnamurthy

    hi

    i think it is not possible even you activate the operation wise costing. since it will ask for cost center for each line item, kindly consult with you technical team whether they can help you

    regards

    thyagarajan

    (0) 
  2. Kaushal Rai

    Hi,

    You get different item number in front of reservation number which differentiate it with others. Probably this could be work around for your issue.

    Regards,

    Kaushal Rai

    (0) 
    1. pradeep Yadav Post author

      Hi,

      Thanks for reply,

      we want separate reservation number for issue material operation wise,we don’t want to use same reservation number again and again for all the operation for add or remove any material in the same M.O.

      There is an option available in configuration to allow creation of individual Purchase Requisition for the each of the non-stock component,entered on the maintenance order components screen.however, there is no such option available for reservations so as to allow creation of separate reservations. Instead of that, system is keeping the same reservation number and creates new line items under the same reservation.

      (0) 