Dear All,

This is regarding creation of separate reservation number for each of the operations of maintenance order.

Please find below example of the requirement:

Existing System:

    Item number
    Material
    Item Category
    Quantity
    UoM
    Plant
    S Loc
    Operation number
    Reservation Number
    Reservation Item Number

1

    MAT1
    L

1

    EA

6300

6300

10

1023

1

2

    MAT2
    L

5

    EA

6300

6300

20

1023

2

3

    MAT3
    L

7

    EA

6300

6300

20

1023

3

Required System:

    Item number
    Material
    Item Category
    Quantity
    UoM
    Plant
    S Loc
    Operation number
    Reservation Number
    Reservation Item Number

1

    MAT1
    L

1

    EA

6300

6300

10

1023

1

2

    MAT2
    L

5

    EA

6300

6300

20

1024

1

3

    MAT3
    L

7

    EA

6300

6300

20

1024

2

There is an option available in configuration to allow creation of individual Purchase Requisition for the each of the non-stock component (Item Category-N), entered on the maintenance order components screen.

However, there is no such option available for reservations so as to allow creation of separate reservations. Instead of that, system is keeping the same reservation number and creates new line items under the same reservation.

We are currently on ECC 6.0 EHP5. Can anyone tell us. whether it is possible by activating business functions for "Operation account assignment"