Multiple Reservation for maintenance order

Dear All,

This is regarding creation of separate reservation number for each of the operations of maintenance order.

Please find below example of the requirement:

Existing System:

    Item number
    Material
    Item Category
    Quantity
    UoM
    Plant
    S Loc
    Operation number
    Reservation Number
    Reservation Item Number

1

    MAT1
    L

1

    EA

6300

6300

10

1023

1

2

    MAT2
    L

5

    EA

6300

6300

20

1023

2

3

    MAT3
    L

7

    EA

6300

6300

20

1023

3

Required System:

    Item number
    Material
    Item Category
    Quantity
    UoM
    Plant
    S Loc
    Operation number
    Reservation Number
    Reservation Item Number

1

    MAT1
    L

1

    EA

6300

6300

10

1023

1

2

    MAT2
    L

5

    EA

6300

6300

20

1024

1

3

    MAT3
    L

7

    EA

6300

6300

20

1024

2

There is an option available in configuration to allow creation of individual Purchase Requisition for the each of the non-stock component (Item Category-N), entered on the maintenance order components screen.

However, there is no such option available for reservations so as to allow creation of separate reservations. Instead of that, system is keeping the same reservation number and creates new line items under the same reservation.

We are currently on ECC 6.0 EHP5. Can anyone tell us. whether it is possible by activating business functions for “Operation account assignment”

Thanks & Regards,

Pradeep

Assigned Tags

      4 Comments
      You must be Logged on to comment or reply to a post.
      Author's profile photo Thyagarajan Krishnamurthy
      Thyagarajan Krishnamurthy

      hi

      i think it is not possible even you activate the operation wise costing. since it will ask for cost center for each line item, kindly consult with you technical team whether they can help you

      regards

      thyagarajan

      Author's profile photo Kaushal Rai
      Kaushal Rai

      Hi,

      You get different item number in front of reservation number which differentiate it with others. Probably this could be work around for your issue.

      Regards,

      Kaushal Rai

      Author's profile photo Former Member
      Former Member

      Hi,

      Thanks for reply,

      we want separate reservation number for issue material operation wise,we don't want to use same reservation number again and again for all the operation for add or remove any material in the same M.O.

      There is an option available in configuration to allow creation of individual Purchase Requisition for the each of the non-stock component,entered on the maintenance order components screen.however, there is no such option available for reservations so as to allow creation of separate reservations. Instead of that, system is keeping the same reservation number and creates new line items under the same reservation.

      Author's profile photo praveen sivala
      praveen sivala

      Hello,

       

      Did you get the answer for this question? Even I have the same requirement now.  Can you please let me know how to generate multiple Reservations in the work order.

       

      Thanks