You can set that only has a material requirements planning dependent for some materials and not others?

I have a scenario where the material (bulk) is also sold in packs of 50 and 200 kg (different codes) for example. The planned independent requirements are entered only for the material considering the sale in other packages, thus needs / reservations dependent on the materials packed are not to be planned.

However The material is also used as part of other products in which case depending on the requirements would have to be planned.

In short, for some materials are dependent needs to be planned and not others. In view MRP4 has the field of planning needs dependents but does not have the option of making according to a type of material for example. Does anyone have any idea or suggestion to solve this?

Thank you

Marcos

To report this post you need to login first.

1 Comment

You must be Logged on to comment or reply to a post.

  1. Neeraj Dixit

    Hi Marcos,

    You can make MRP controllers as per the requirements of planning strategy.

    then you can use strategy group 40 in material master MRP3.

    then you create PIR . this strategy will not generate requirements till sales order qty will not more than PIR.