Calibration Process Steps

Introduction:

This scenario describes how to process the test or measurement equipment in a calibration inspection. The objective of a calibration inspection is to determine whether each piece of equipment specified in the maintenance order meets the predefined performance specifications.

Process Steps:

 

Step 1: Create Quality Instrument as Equipment in SAP System

Create Equipment.jpg

Step 2: Create Catalog Code groups & corresponding codes

Catalog.jpg

Step 3: Create Selected Sets

Selected Set.jpg

Step 4: Create Master Inspection Characteristics (MIC)

All the Qualitative & Quantitative parameters will be created as Master Inspection Characteristics in SAP system.

MIC.jpg

Step 5: Create Sampling Procedure to create the samples out of multiple equipments.

If Inspection will be done on 100 % sample, make the sampling type as 100 % Inspection.

Sample.jpg

 

Step 6: Create Task List for Quality Inspection.

There are different types of Task lists available. Here based on the requirement, either Equipment Task List or General Task list will be created.

Task.jpg

Step 7: Create Maintenance Strategy to define the Calibration Frequency (Required only in case of Strategy Plan is used for Calibration)

Strategy.jpg

Step 8: Create Maintenance Plan for Calibration Process

Plan.jpg

Step 9: Schedule the Maintenance Plan

Schedule.jpg

Step 10: Display the Orders created based on Scheduling

Display.jpg

Step 11: Release the order

Release.jpg

Step 12: Results Recording for the Inspection Lot

Results.jpg

Step 13: Usage Decision for the Inspection Lot

Usage.jpg

Step 14: Do the Completion Confirmation for PM Order operations

Confirmation.jpg

Step 15: Do the TECO for PM Order

TECO.jpg

Assigned Tags

      8 Comments
      You must be Logged on to comment or reply to a post.
      Author's profile photo Former Member
      Former Member

      Hi Maheshwaran,

      Thank you very much, Nice to see some good sharing.

      Author's profile photo Sarfaraz Ahmed
      Sarfaraz Ahmed

      Hi,

      Very helpful post.

      Thank you very much.

      Author's profile photo Former Member
      Former Member

      Dear Sir,

      The document is very well explained. I have a doubt regarding it. I've followed all steps, but after doing calibration, I want to re-calibrate again before entering my usage decision. How can I do that?

      Author's profile photo Former Member
      Former Member

      thank you sir

      Author's profile photo Seydi Sag
      Seydi Sag

      Very helpful post!

      Author's profile photo Ajaysingh Dehariya
      Ajaysingh Dehariya

      hi,

       

      Good Document , please include.

      Order type - Inspection type mapping.

      Inspection points while creating task list. without this inspection lot will not be created.

       

      regards

      ajay

      Author's profile photo IMRAN PATHAN
      IMRAN PATHAN

      can you please explain calibration through subcon. which material type should be used to do calibration through subcon.

      Author's profile photo Sharanabasanagouda Marigoudra
      Sharanabasanagouda Marigoudra

      Very Good information Sir,,,,