As it is not possible to replace the pics in the original post (I cannot upload further pics – blog seems to big 🙂 ), here are the updated pics 1 and 2).

06.12.2012: Updated replaced PPF actions starting SP7.

Pic 1: sync typo updated

charm_flex with SP5 names and marked process.jpg

Pic 2: Cancel Preliminary Import leads to ‘Successfully Tested’, Set Back to ‘In Development’ leads back to ‘In Development’
Preliminary Import Status overview- without actions and conditions.jpg.

And additional an overview with the ChaRM actions and consistency check:

Preliminary Import Status overview.jpg

I will just enter a link in the original post,

best regards,

Michael

Assigned Tags

      2 Comments
      You must be Logged on to comment or reply to a post.
      Author's profile photo Boris Milosevic
      Boris Milosevic

      Hi Michael ,


      in SP10 we have PPF action changed again now is named SMMJ_TESTED_AND_NOT_OK_MJ and scheduled just in E0012?, instead to be scheduled to E0013 as well as E0014 like is presented in above pictures ??


      is ther any news regarding PI in SP10?


      rhds


      BM

      Author's profile photo Former Member
      Former Member

      Thank you Michael for very informative blog !

      It helped me understand what is running behind the scenes to be able to change the process as needed.

      My client wanted to skip testing steps (E0012 and E0013) for preliminary import, as all is supposed to be already tested in QA before requesting preliminary, so we wanted to jump from E0011 to E0014.

      Your detailed information helped me to configure the way around.

      Thank you again