Skip to Content

There are three ways to deal with Daylight Saving Time:

1 Two hour downtime method: Completely avoid running SAP system during this double hour.

2 One hour downtime method: See Note 102088

3 Zero downtime method: Use the default “stretched time”.

For details, please read my article.

To report this post you need to login first.

Be the first to leave a comment

You must be Logged on to comment or reply to a post.

Leave a Reply