cancel
Showing results for 
Search instead for 
Did you mean: 

how to use material valuation type C1 in work order iw32

ayu-123467
Explorer
0 Kudos

hello,

I have two materials with the same number but one has an empty valuation type with price A and the other has a valuation type C1 with price B, I input the material in iw32 but the price recorded from material valuation type empty.

What should I do, so i can input material in iw32 that get  price from material valuation C1

Thank You

Accepted Solutions (0)

Answers (1)

Answers (1)

MTerence
Active Contributor
0 Kudos

Hi, 

Check the Costing Variant configuration

Regards

Terence